Questions from the plant floor
Our engineers write about the decisions we face on the floor: when a milling batch is ready, how to meter a glaze pump and how to finish a tile to specification. Each article starts with the actual process.
Milling & slip preparation
Milling & slip preparation
Where can two-stage ball milling save electricity in ceramic body preparation?
Milling & slip preparationCan the coarse mill feed the fine mill without an intermediate slip tank?
Milling & slip preparationOne ceramic line used 12.15 fewer kWh per tonne of feed. What was the net benefit?
Milling & slip preparationFrom 250 to 325 mesh: is another hour of ceramic body milling worthwhile?
Motors & drives
Motors & drives