GongKee 工科机电
English
Talk to an engineer
☰

One ceramic line used 12.15 fewer kWh per tonne of feed. What was the net benefit?

On the same ceramic body line, we matched meter readings to feed tonnage. Conventional milling averaged 38.86 kWh/t in 2023. In February 2025, two-stage milling used 26.71 kWh/t, including the slurry pump. Here is how the difference of 12.15 kWh/t affects the electricity bill and operating costs.

GONGKEE engineering notes · Milling & slip preparation

What the two periods measured

The 2023 conventional-milling average covered about 276,100 tonnes of feed: 38.86 kWh/t. In February 2025, staged milling used 196,229.6 kWh for 7,345.48 tonnes of feed, including slip pumping, or 26.71 kWh/t. The recorded difference was 12.15 kWh per tonne of feed. The periods differed in length and the recorded discharge fineness also differed. A new line needs trials on its own feed to estimate achievable savings.

Price load shifting separately

The plant report modelled moving approximately 29,000 kWh a month out of a higher-price period. With a tariff difference of CNY 0.60/kWh, the estimated tariff saving alone was CNY 17,400 a month. To evaluate another plant, multiply metered energy in each time band by the applicable tariff under each schedule and compare total bills. This avoids counting shifted energy twice.

Include labour and grinding media

The historical operation added about CNY 10,000 per month in labour for opening hatches and discharging slip. For a new project, compare electricity, media wear, labour and maintenance per tonne of accepted dry solids at equivalent quality and delivery, then apply comparable annual output. Account separately for capital outlay, downtime and payback. Under a media-wear service agreement, the plant can retain the electricity savings while GONGKEE takes responsibility for media wear on agreed terms after trial acceptance.

GONGKEE video · Chinese audio · Chinese captions and translated summaries in English, Russian and Arabic

Related reading