Put three times on one shift log
Record when coarse milling finishes, when the fine mill is empty and when transfer is complete. Without buffer storage, a full fine mill holds up the coarse mill. A slow transfer can leave the fine mill waiting. Size the two stages from actual batch volumes and discharge frequency, then check tonnage delivered over several shifts.
Check pumpability as the feed changes
Feed moisture, added water and coarse-discharge fineness can all affect slip flow. For each batch, log solids content, temperature, flow time in the same cup and actual transfer duration. When transfer and fine milling both take longer, examine the pipeline and the mill separately. A flow cup supports comparisons under like conditions. Absolute viscosity requires an appropriate instrument.
Schedule around slip delivery
Work backwards from the delivery time required by spray drying or another downstream operation. Move only the load that fits the plant’s lower-price window. Limited flexibility, mismatched batch capacities or an already competitive cost per accepted tonne can favour keeping the existing line. A first review needs mill counts and capacities, feed type, shift output and delivery deadlines.