From 250 to 325 mesh: is another hour of ceramic body milling worthwhile?

Define the sieve opening, permitted residue and tonnes of accepted dry solids before comparing grind times. A residue result measures what stays on one sieve. Particle sizes below that opening, added electricity and fired quality each need their own check.

GONGKEE engineering notes · Milling & slip preparation

Define the sieve and the mass basis

Sample the coarse and fine outlets from the same batch, using the same sieve, dry-mass basis and wet-sieving procedure. If the sample contains 100 g of dry solids and 2 g of dried material remains on the sieve, residue is 2% by mass. Record the actual aperture, sieve standard and milling time. If two slips have the same residue, compare their size distributions using identical preparation and dispersion methods.

Measure the benefit of the final hour

Take timed samples as the batch approaches its residue limit, logging cumulative electricity alongside each result. Compare the fall in residue with the additional kWh consumed and the accepted dry tonnage still deliverable that shift. If residue changes slowly, examine the retained material for hard grains and dispersible agglomerates before committing to longer milling.

Follow the batch through firing

If a tighter grind is intended to improve tile quality, carry the slip batch identifier through spray drying, pressing and firing. Compare powder moisture and size distribution, then fired water absorption, shrinkage and first-quality yield under comparable operating conditions. Historical electricity readings from another job cannot establish a plant’s compliance with its own 325-mesh requirement.