Start with your process
Choose a process to see the machinery, measurements and operating conditions.
Technical questions
Can the coarse mill feed the fine mill without an intermediate slip tank?
GONGKEE’s direct-transfer layout pumps slip from coarse milling straight into fine milling. Finished slip still goes to a downstream tank. Feasibility depends on whether successive batches can meet the plant’s delivery schedule without the intermediate buffer.
How do you verify a direct-drive retrofit on a ceramic slurry mixer?
Before replacing the belt, record the impeller speed, accepted slurry output and opening and closing meter readings for one batch. Repeat the task after the retrofit.
How much material should be ground off a tile body before glazing?
Loose powder, shallow marks and local high spots call for different amounts of removal. Set up a trial using bodies from one batch and evaluate the finished glaze alongside surface flatness.
Discuss your production line.
Start with the equipment model, operating hours, meter readings and accepted output from the same period.


