Ceramic and stone finishing equipment, abrasives and process support
Green-body preparation, bisque polishing and slab finishing each call for a different surface. GONGKEE uses same-batch samples to select stock removal, tooling and line speed, then compares running cost per accepted square metre.

Define the surface to be delivered
For a ceramic line, identify whether the body is dried or bisque-fired, state the glazing and firing requirements and retain matched samples. For stone, provide material, slab dimensions and thickness, current speed and target gloss or flatness. Mark the defects that most often cause downgrades.
Measure tool life against accepted area
Keep downstream conditions comparable and record accepted area, finish quality, abrasive consumption or time between disc changes, utilities, downtime and rework. For ceramic bodies, follow samples through firing and compare first-quality yield before trialling lower glaze application. For stone, use the agreed surface acceptance standard.
Move from sample trials to the line
Select heads, wheels, equipment and consumables for the existing line interfaces. Layout drawings, workpiece sizes, adjoining process speeds and available installation space let the team plan trials, selection and commissioning. Agree on documents, spare parts and the scope of on-site service for each project.